- Details
- Category: Current Issue
Nov. 13 crews put the sides of the bridge on Rt. 44 into place. The upstream side was done first and the downstream side followed. Officials said the lamp posts that were part of the original bridge will also be replicated. The bridge is on track to reopen Nov. 30.