The Before
This photo was taken before the Kennedy Drive commuter lot was closed April 7. The lot will be closed for construction for four to six weeks, according to Mayor Barney Seney. Crews will be removing paving, digging trenches to run electrical lines and more. And then repaving. Seney said said, “We apologize for the inconvenience and appreciate your anticipated cooperation.” The storm water discharge system is completed. It channels runoff under Kennedy Drive to be filtered before releasing the water into the Quinebaug. Linda Lemmon photo.
More 'Before'
The parcel next door to Gerardi Insurance Hilb Group, is now cleared. A 6,000-foot addition will get underway soon. Linda Lemmon photo.